PorthouseDean
Industry insights

What changed this week, and what it does to the job on your desk.

Written for industry professionals, from the structural end of the job. One thing at a time, in plain English, with the sources linked so you can check the numbers yourself. By Sam Dean.

Sam Dean
Sam Dean Director & CEO, PorthouseDean

Sam runs PorthouseDean, the structural engineers behind several hundred extensions, lofts and new-build homes a year across England and Wales. He writes about the policy, planning and market shifts that change the work coming in for architects, engineers and builders.

Industry tracker

Where the market is heading for your trade, and the numbers behind the pieces below. Every figure links to the body that published it, with the period it covers and the date we checked it.

Checked
5 Oct 2026

−13.6%

In the three months to August 2026, mortgage approvals for house purchase were 13.6% lower than a year earlier. A house purchase is often followed by an extension or a loft conversion, so this is an early sign of the work to come.

For architects, that points to a quieter market around February 2027.

Still to comeAlready felt−10%0%+10%+20%+30%+40%Jul 25Jan 26Jul 26Jan 27Today

RIBA's workload index for private housing has followed mortgage approvals by about six months (monthly figures, January 2023 to August 2026). The line is the same for every trade. It is placed 6 months later than the Bank publishes it, which is when it has tended to reach architects.

For engineers, that points to a quieter market around May 2027.

Still to comeAlready felt−10%0%+10%+20%+30%+40%Jul 25Jan 26Jul 26Jan 27Today

Our own turnover has followed mortgage approvals by about nine months (June 2023 to August 2026). The line is the same for every trade. It is placed 9 months later than the Bank publishes it, which is when it has tended to reach engineers.

For builders, our best guess is a quieter market around August 2027.

Still to comeAlready felt−10%0%+10%+20%+30%+40%Jan 26Jul 26Jan 27Jul 27Today

This one is a finger in the air, not a measurement. Architects feel a change after about six months and engineers after about nine. We have assumed work starts on site about three months after the calculations, which makes twelve. The line is the same for every trade. It is placed 12 months later than the Bank publishes it, which is our guess at when it reaches builders.

It is an indicator, not a forecast for your business: three years of figures and one market cycle. Source: Bank of England: mortgage approvals for house purchase, checked 6 Oct 2026.

Bank Rate

3.75%

Held since December 2025

What your client's borrowing is priced off.

Next decision 5 November 2026 Bank of England

House price growth

0.8%

Halved from 1.6% in August

Barely moving, so a client has little headroom if a budget slips.

Year to September 2026 Nationwide House Price Index

Planning applications received

78,700

Down 2% year on year

Applications now are the builds of next year.

England, Apr to Jun 2026 MHCLG planning statistics

Householder decisions

37,700

91% granted; down 14% on a year ago

Extensions, lofts and conversions — half of everything decided.

England, Apr to Jun 2026 MHCLG planning statistics

Minor applications inside 8 weeks

39%

87% once extensions are agreed

The statutory clock is met far less often than the headline suggests.

England, Apr to Jun 2026 MHCLG planning statistics

How to read this

Planning figures are quarterly and lag by about a quarter, so the latest available is not the same as the latest month. Rates and house prices move monthly. Nothing here updates itself — a person checks each figure against its source, which is why the date is on the panel.

All insights

Latest insights

What this is

Why we write this

If you design or build homes for a living, the thing that will cost you money in eighteen months is being announced this week, in a document nobody has time to read. Certainly not you. You are running three jobs and chasing an invoice.

We have the time. We also have the vantage point: we do the structural calculations and drawings for several hundred extensions, lofts, renovations and new-build homes a year, for architects, designers and builders all over England and Wales. So we see the pattern across far more jobs than any one firm does, from the end where things go wrong.

So we read the announcements, the statistics and the regulations, and we tell you the one thing that actually matters this week, what it does to a live job, and what to do about it.

Nobody else is doing that for you. The trade press writes for developers. Government writes for councils. Consultants write to sell consultancy. The people who design and build most of Britain's homes carry the risk and get the leftovers.

And yes — we are a structural engineering practice, and we would like some of you to send us work. We are not going to pretend otherwise. But the deal is simple: this has to be worth your time whether or not you ever instruct us. If it stops being worth your time, unsubscribe. We would rather you did that than sat there ignoring us.

How we do it

One thing at a time. One announcement, or one number, explained properly — not five of them skimmed.

Written by someone in the industry, for people in the industry. We run a business too. We know what an unpaid invoice at ninety days feels like.

Plain words, short, and funny where it can be. Some of this is genuinely funny. Most of it is tax.

We know what we are and what we are not. We are structural engineers, not planning consultants. On what a change does to a building or to a P&L we will give you our view, because that is what we do all day. On planning law we are reporting, not ruling: we will tell you it happened and what it means for a job, and point you at someone who does it for a living for the rest.

Every number carries its source, linked. Where something is not known yet, we say it is not known.

Nothing in the article is a pitch. If you want a quote there is a button for it, and it is not in the middle of the writing.

What you get

A short read every week on one thing that changed. It will be one of three:

  • What is coming. Regulations, deadlines, consultations and policy that will land on you later. Mostly these are diary entries you would rather make now than in a hurry.
  • What it does to your numbers. The Budget, tax, fees, late payment, insurance, whether you can afford to hire, and whether clients are saying yes.
  • What it does to the building. Structure, buildability, materials and lead times, and what building control is asking for this month.

Take it in whatever form suits. It is here, it goes out on LinkedIn, the ones worth watching become a short video, and there is a round-up once a month by email.

And there is a comment thread under every piece. Sign in and you can argue with me, or better, with each other. That is the point of this rather than a feature of it: there is nowhere much for small firms to compare notes on any of this, and half of you will disagree with me anyway. The disagreement is usually more useful than the article.